PIT 37: Empty, no contents.
PIT U-1: 1,589 kg DU in chips, machine turnings, shavings, cuttings, residue, and scrap.
PIT U-2: 5,119 kg DU in chips, machine turnings, shavings, cuttings, residue, and scrap; one each irradiated melt chamber: one each copper crucible containing DU scrap.
PIT U-3: 1,114 kg DU in chips, machine turnings, shavings, cuttings, residue, and scrap; 1,000 Ibs of Burn Site DU-contaminated soil and debris: one each DU-contaminated 300 lb crucible.