MWL INVENTORY:

 PIT 17: "Casseto" and "Triga" parts from NTS; one each 0.5 mCi Ra-226/BE source, one each 36 Ci C0-60 source, and one each 6.0 Ci Sr-90 source each in a lead container encapsulated in concrete-filled 55-gallon drum; 11 each Kr-85 cells (8.1 mCi total); 2 each uranium carbide nose cones; uranium and zirconium scrap in a 55-gallon drum; 30 Ci tritium lab waste in brass tube; neutron generator tubes; dummy DU reservoir; DU scrap and machine parts; test specimens brazed to aluminum; fusing and firing assemblies; DU-contaminated weapon components; 3 kg thorium oxide; 457 kg DU

PIT 18: Pu-238 contaminated paper, gloves, small equipment, components, wire, and sockets; 12 each spark gap tubes; 7 each 10 uCi Ra-226/Be sources in a lead container encapsulated in concrete-filled 55-gallon drum; Pu-238 contaminated vacuum pump radioactive rock; electrical cables from junction box; reactor fuel element ends (5 rem/hr on contact); neutron generator tubes; Pershing missile test debris; DU-contaminated weapons components; 155 mm gun projectile with a Sb-124 source: 762 kg DU: 45 Ci tritium

PIT 19: Tritium-contaminated buckets, clothing, swipes, rags, paper, work gloves, vacuum cleaner, and decontamination materials; reactor fuel element ends (5 rem/hr on contact); one each Sb-124 source projectile (10 rem/hr on contact); neutron generator tubes; scrap metal, DU-contaminated muffle furnace; irradiated diodes, transistors, capacitors, resistors, circuit boards, voltage regulators, and other miscellaneous electrical components: one each 3.5 ~Ci Co-60 source and one each 4.1 uCi Co-60 source in a lead container encapsulated in concrete-filled 55-gallon drum; Pershing missile test debris; tritium bed: scrap iron; Pu-238/239 contaminated filters: 621 kg DU; 60 Ci tritium.

PIT 21: Two each 3.4 ciCi Co-60 sources, one each 31.8 uCi Sr-90 source, one each 100 uCi Co-60 source, one each leaking Sb-124 source, and one each spent Cs-137 source in a lead container encapsulated in concrete-filled 55-gallon drum; NTS irradiated material; DU-contaminated paper, towels, and poly bottles; plutonium oxide-contaminated filters, towels, tape, paper, cleaning and decontamination materials; 4 each irradiated thermal batteries; oil diffusion pump and baffle; irradiated diodes, transistors, capacitors, resistors, circuit boards, voltage regulators, and other miscellaneous electrical components; neutron generator tubes; Pershing missile test debris; DU-contaminated weapons components; 16 kg thorium; 1,731 kg DU; 0.1 grams Pu-238; 30 Ci tritium.

PIT 24: "Hudson Moon" and "Mint Leaf" test debris from NTS; 3 each 500 uCi Ra-226 ionization alphatron gauges encapsulated in a concrete-filled A/N can; one each 45 Ci Co-60 source in a lead shield housing; irradiated diodes, transistors, capacitors, resistors, circuit boards, voltage regulators, and other miscellaneous electrical components; reactor fuel element ends (5 rem/hr on contact): tritium-contaminated General Electric vacuum system, trigger gauge, transducers, hoods, vacuum pump, and panels; Pu-238, Pu-239, U-235, and U-238 contaminated glove box, gamma probe, and stereo microscope; neutron generator tubes; Pershing missile test debris; DU-contaminated weapons debris; 140 kg DU: 60 Ci tritium.